For the pre-construction meeting

The polish that wins the build.

Plans, finishes, schedule and allowances laid out so clearly the conversation moves from price to start date.

For iPad and Mac
Start freeSee pricing

No credit card needed.

A large timber-framed house at the dry-in stage, photographed from inside the frame looking out through the open stud walls to a wooded lot.
The Ridgeway Build — Classic, built in PitchBoards.

Classic

Built in PitchBoards

The Ridgeway Build

4 boards for one build, made in the same app you would use — every name and figure on them is sample content. Present them on the iPad at the pre-construction meeting. Afterward, the client has it all in one place.

Open the live board (opens in a new tab)
Real estate first, custom home builders next. PitchBoards was built for real estate, and that is where it is most worn in. The app, the sharing and the branding are identical for custom home builders — what is still being shaped is the starting content for your trade. Early users get that shaped around how they actually pitch.

For the first meeting

Every story this build needs to tell.

The plans, the finish level, the schedule, the allowances — and the last three houses you handed over. One board.

A destination opened inside the pre-construction presentation on an iPad: photographs of the framing, the interior at finish and the finished house, beside a card of the build's details, the schedule and the contract allowances.

For the couple deciding

The link they open at the kitchen table before they sign.

Plans, selections, progress photos and updates, all in one place they open on any device — no new PDF to send every week.

The same pre-construction presentation opened from a share link in a desktop browser, with the phone version standing in front of it — the board reflowed as a scrolling one-pager, the same headline over the same photograph.

For the whole company

Every client sees the same company.

Your mark and colors — identical on every presentation that leaves, whichever estimator put it together. What changes is the lot, the plan and the allowances.

Two pre-construction presentations side by side on iPads: the same Northpoint wordmark, accent and typeface on both — one the Ridgeway build under Tom Reyes, the other the Halcyon lake house under Grace Nunn.

Win the next build.

  1. Recommended

    Get the app

    PitchBoards for iPad and Mac. Start free inside the app.

    For iPad and Mac
  2. Start in your browser

    Type your website. We build your first board in your brand, and you see it before you sign up for anything.

    Start free
  3. Not sure yet?

    See it before you decide.

    See a real one (opens in a new tab)

No credit card needed.

Other industries