For the design consultation

Show the backyard. Win the dig.

Past builds, the design, the packages and the financing laid out so clearly the conversation moves from price to dig date.

For iPad and Mac
Start freeSee pricing

No credit card needed.

A new geometric pool and a raised, glass-tiled spa in a Scottsdale desert backyard at blue hour, the water lit turquoise, three fire bowls burning on a stucco wall, teak loungers, saguaro and mountains beyond.
The Mesquite Lane backyard — Classic, built in PitchBoards.

Classic

Built in PitchBoards

The Mesquite Lane backyard

3 boards for one pool, made in the same app you would use — every name and figure on them is sample content. Present them on the iPad at the design consultation. Afterward, the homeowner has it all in one place.

Open the live board (opens in a new tab)
Real estate first, pool builders next. PitchBoards was built for real estate, and that is where it is most worn in. The app, the sharing and the branding are identical for pool builders — what is still being shaped is the starting content for your trade. Early users get that shaped around how they actually pitch.

For the kitchen-table consultation

The whole backyard, before the first shovel.

Your past builds, their design, the finishes, the packages and the timeline. Each is its own page on one board, and the homeowner taps the one they care about first.

The Mesquite Lane backyard design consultation on a PitchBoards canvas: a dusk photograph of a geometric pool with a spillover spa and fire bowls under the title, the pool’s sample size and depth top right, and a row of photo tiles for past builds, the design, packages, finishes, financing, the timeline, the company and the next step.

For the couple choosing a level

Good, better, best, side by side.

Three packages, each with its own render and what it includes. The add-ons sit on their own page, beside a sample estimate the homeowner can read at the table.

The Packages board for the Mesquite Lane backyard: Essential, Signature and Resort as three tall columns showing the same backyard at a growing scope, Signature marked most chosen, over tiles to compare all three, add-ons, safety, a sample estimate, financing and what happens next.

For the whole pool company

Every homeowner sees the same company.

Your mark, your colors and your typefaces stay identical on the consultation, the packages and the build timeline, whichever designer put them together. What changes is the backyard.

Three Saltwell Pools & Outdoor boards in a grid beside the dusk photograph they are built on: the Mesquite Lane backyard consultation, the packages page and the build timeline, sharing one wordmark and one identity line.

Win the next backyard.

  1. Recommended

    Get the app

    PitchBoards for iPad and Mac. Start free inside the app.

    For iPad and Mac
  2. Start in your browser

    Type your website. We build your first board in your brand, and you see it before you sign up for anything.

    Start free
  3. Not sure yet?

    See it before you decide.

    See a real one (opens in a new tab)

No credit card needed.

Other industries